Tuesday, 21 December 2010
Monday, 20 December 2010
Well, the house is up and inhabited! We have a lodger and are seeing how the building likes winter! The exceptionally heavy snow caused some gutter damage and the low temperatures revealed a weak spot in the water supply to house which is easily remedied. Other than that, the project can be deemed to have been completed well. Thanks to Rob, (architect) Arthur (builder)and his doughty team.
Friday, 11 June 2010
Friday, 7 May 2010
Day 46 Fri 7th May
Monday, 3 May 2010
Saturday, 1 May 2010
Day 41 Friday 30 April
Sunday, 25 April 2010
Day 36 Fri 23 April
Wednesday, 21 April 2010
Sunday, 18 April 2010
Rannoch Moor
Saturday, 17 April 2010
Day 31 Fri 16 April
Thursday, 15 April 2010
Day 30 Thurs 15 April
Wednesday, 14 April 2010
Not much happening on the outside today, apart from sills going under the windows. On the inside insulation was being put up on the walls. Arthur was looking a bit vacant until he realised I was on the prowl with my camera! He told me that Beth and Scott and Paul enjoy looking at pictures of him at work, but these are very very hard to come by. I'll try and persuade him to pick up a hammer and hand it to someone next time he comes.
Tuesday, 13 April 2010
Day 28 Tues 13 April
Monday, 12 April 2010
Day 26 Sunday April 11th
Subscribe to:
Posts (Atom)